The challenge
Difficult soil and ground conditions under a front/back duplex.
The approach
The geotechnical engineer was brought in early and the foundation was engineered for the ground, not patched after it.
The outcome
Two homes with high ceilings, skylights, triple glazing and Scavolini kitchens, built in about 12 months.





