← All insights
Costs and financing

The lender’s file for your multiplex

Construction lenders vary, but a multiplex file usually comes down to five parts: site, plans, budget, contract and exit.

InoBuilt Construction · · 2 min read

The lender’s file for your multiplex

Construction lenders vary, but a multiplex file usually comes down to five parts:

The lender’s file for your multiplex: Survey
  1. The site. Title or purchase contract, survey, and a zoning and servicing check on the lot.
  2. The plans. Drawings and engineering reports, with the building permit issued or applied for.
  3. The budget. Line by line, backed by quotes, with a contingency line.
  4. The contract. Signed with a licensed builder: scope, price basis, schedule and warranty enrolment.
  5. The exit. How the loan is repaid: strata sales (comparable sales and a timeline) or a refinance (rents and the debt service they support). Lenders typically order an appraisal of the completed value.

One BC detail to build into the draw schedule: the Builders Lien Act requires a 10% holdback on progress payments.

The lender’s file for your multiplex: Budget

We will start with the budget and schedule.

Have a lot in mind?

Send the address and we’ll run a free desktop check of what it appears to allow, within two business days.

Request a lot check →
Sources

BC Builders Lien Act, SBC 1997, c 45, s. 4 (10% holdback on progress payments). BC Housing: licensed residential builders must provide home warranty insurance under the Homeowner Protection Act. No statistics are used in this post. The five parts describe typical lender file contents; requirements vary by lender and program.

General information, checked Nov 3, 2026. Rules change and differ by municipality; confirm for your lot before relying on it. Not legal, tax or financial advice.

ShareLinkedIn

Talk it through with a builder.

Call 604 340 6021 or send the address; we reply within one business day.

Start a project →
Call 604 340 6021Start a project